Drainage: Soil and Waste Pipes, Vents, Manholes, Gullies and Rainwater
Draw the fixtures and everything that takes their water away: waste and soil pipes, vents, inspection chambers, buried drains and rainwater, with falls, inverts and a generated drain to the street.
Its three tools
Open **CAD tools** in the tool rail and then **Drainage**. The group has three tools, and each has a command you can type.
**Catalogue** (`DRAINAGE`): browse the trade's fittings by system, with each one's plan symbol. Picking one arms Place with it.
**Drain** (`DRAIN`): draw a run. Click each point; press Enter to finish. The run starts on the trade's usual size, and its size, system and levels are in its panel afterwards.
**Place** (`PLACEDRAIN`): put down the fitting you picked. Each fitting stands at its usual height, which its panel can change.
A run snaps to the connection points (ports) of fittings, so a pipe or a cable that starts on a fitting is joined to it. A fitting that should be connected and is not is listed in the Issues tab as not connected.
What is in the catalogue
**Fixtures**: WCs, wash hand basins, baths, showers, kitchen and utility sinks, washing machine and dishwasher connections, bidets, urinals, traps, floor traps and wastes.
**Soil and vent**: vent stacks and terminals, air admittance valves, cleanouts, septic tanks.
**Below ground**: inspection chambers, manholes, inspection pits, rodding eyes, sumps and pumps.
**Surface water**: gullies, soakaways, drainage trenches and interceptors.
**Rainwater**: downpipes, roof drains and hoppers.
Falls and levels
**Gradient**: a drain's panel shows its fall as a gradient, and the **Invert at start** and **Invert at end** that follow from it.
**Chambers**: a chamber's cover level is where the ground is; its invert comes from the drains running into it, and its depth is the difference. Move a chamber further away and it goes deeper, because the fall is held.
**Branches**: a branch joins a main above it, never below.
Generate the drains
Settings › Structure › **Drainage** runs the soil, waste and rainwater from the fixtures in the rooms out to the boundary that faces the street, where the sewer is.
Name the rooms first: it finds fixtures in rooms named as a bathroom, a kitchen or a utility. Every invert comes from one fall, and what it writes is marked as proposed.
Generating again replaces its last run; what you drew stays. With no plot boundary it stops a fixed distance from the house and says so. See [Site plan](/docs/site-plan).
Tip: nothing generated is designed. It is a first layout to check and change.
The checks
**Falls**: a drain with no fall, too flat, too steep, or too shallow under the ground.
**Chambers**: a chamber too small or of the wrong kind for its depth, an inverted chamber.
**Stacks**: a soil stack that does not line up from storey to storey.
**Rainwater**: a gutter too small for the roof that falls on it, a missing downpipe, downpipes too small or too far apart.
In 3D and on paper
**3D**: runs are built as real cables, pipes and ducts at their levels, and fittings stand at their mounting heights. In 3D you can drag a run's end or its body, and it snaps to corners and to other fittings' ports.
**Through walls**: a run that crosses a wall or a floor cuts its own hole through it, and the hole moves with the run.
**Showing and hiding**: the Layers tab has a switch for each trade, and an X-ray switch that shows the services through the building.
**Sections**: a run cut by a section is drawn as its section, and the ones beyond it along their line.
**Schedules**: the Schedules tab lists runs by size, fittings by kind and boards by circuit. See [Sheets and schedules](/docs/sheets-and-schedules).
Read next
Frequently asked questions
Why did the drain generator only drain the roof?
It finds fixtures in rooms named as a bathroom, a kitchen or a utility. Name the rooms in the plan and run it again.